Asian Power & Energy Front

Daily by Hayao Adachi

080909


Watch the latest videos on YouTube.com


| Who am I| | Asian Power & Energy Front| | Photos | | Japanese Version |

Since 1998 October
iJust before update 477,612, mail magazine 965)




Asian Power & Energy Front



‘å‚«‚È’n}‚ÅŒ©‚é


Daily Asia Power Energy, Septyember 9, 2008 - India's power reform and pool@market

"India's power reform and pool@market"

Just one month before, the August 11, 2008, in this column, India's power pool market was reported. "Since the government does not work hard to create a pool market, the Stock Exchange is encouraging NTPC, national thermal power corporation, NHPC and Tata to whip them to create the market platform and necessary infrastructure for the pool market. "

Today's issue; Tata Consultancy Services are leading the technical matters and forming the joint venture with NTPC, NHPC and PFC to build the platform for the national level of power exchange. The Stock Exchange is moving in control to form the joint venture.

On India's power reform, IEEJ's text, published in September 2004, briefly summarized. At the time of 2004, for the next five to 10 years, the main items to be implemented are; open access to transmission lines, promotion of interstate trade, and the formation of market power pool and liberalization of the system. The IEEJ's text emphasized on pool market that "In order to promote competition, the maintenance and development of transmission network is important."


Recently, in the Philippines WESM of pool market, the accident at the substations caused supply shortage and KWh market value went up to nearly 70 cents. It was happened to be a great confusion. Indeed, the current transmission lines in India have necessity of a network maintenance and, in addition, issue of a large loss in the system. I think, the current supply shortage in India is probably going to be pandemonium unless otherwise to improve the demand and supply gap.

Today, a few important news continued. Chief North Korea's Kim Jong-Il, may become partially paralyzed. Thailand's Prime Minister Mr.Samack was forced to resign by the Constitution court. Crude oil prices on the barrels have been moved to 102 dollars level. It was expectations the OPEC to increase production.


Reference

September 8, 2008

Pakistan

œ080909A Pakistan, Daily Times
‚ÙCƒ€ƒ“ƒ_‘½–Ú“Iƒ_ƒ€‚ÉŠÖ‚·‚é”»Œˆ‚ð’Iã‚°
IHC suspends previous verdict on Munda Dam Project
http://www.dailytimes.com.pk/default.asp?page=2008%5C09%5C09%5Cstory_9-9-2008_pg7_20

Nepal

œ080909B Nepal, The Rising Nepal
ƒlƒp[ƒ‹V­•{­ô”­•\C…—ÍŠJ”­‚É‚àd“_
Focus on statute, socio-economic transformation
http://www.gorkhapatra.org.np/detail.php?article_id=6447&cat_id=5

India

œ080909D India, Economic Times
ƒ^ƒ^ƒRƒ“ƒTƒ‹ƒ^ƒ“ƒgC“d—ÍŽæˆøŽsê‚̘g‘g‚ÝŒŸ“¢‚Ö
TCS signs JV with NTPC, NHPC, PFC to set up power exchange
http://economictimes.indiatimes.com/News/News_By_Industry/Energy/Power/TCS_signs_JV_with_NTPC_NHPC_PFC_to_set_up_power_exchange_/articleshow/3458865.cms

China

œ080909C China, xinhuanet
ŽO‹¬ƒ_ƒ€C‚P‚PŒŽ‚É‚àŠ®¬Cƒtƒ‹‰Ò“­‚ցC‚P‚W,‚Q‚O‚O‚l‚v
Three Gorges project to begin full operation in November
http://news.xinhuanet.com/english/2008-09/08/content_9859678.htm


カスタム検索

Past News

œVietnam's power crisis continues (080908)
œIndonesia's second Crash Program (080907)
œ China and India race to capture the uranium (080906)
œIndia's gas to Warring Period (080905)
œIndia's hydropower development delay (080904)
œMyanmar's hydro and natural gas (080903)
œ‚o‚‚—‚…‚’@‚ƒ‚’‚‰‚“‚‰‚“@‚‰‚Ž@‚h‚Ž‚„‚‚Ž‚…‚“‚‰‚ (080902)
œIndia and Nepal river management (080901)
œIndia's natural gas production (080831)
œChina and Vietnam in Laos (080830)

Any comment, please
PGA02435@nifty.com


|@nifty| | Gmail | |Bangkok Post| |Manila Bulletin| |Jakarta Post| |Economic Times| |ŽžŽ–’ʐM| |ZAKZAK|