Asian Power & Energy Front
Watch the latest videos on YouTube.com

Site Map
| Who am I| | Asian Power & Energy Front| | Photos | | Japanese Version |

Since 1998 October
(本更新直前543,497 ,メルマガ配信数 1.475)


ー August 22, 2009 ー Indonesia PLN starts 2nd 10,000MW power developmet program

August 22, 2009 - Indonesia PLN starts 2nd 10,000MW power developmet program -
This is edited from the Japanese Version only by eliminating Japanese phrases.

From YouTube

Geothermal Wells Garut Indonesia
Two geothermal well in Garut, Java, Indonesia. I think they're run by Star Energy or Pertamina



Japanese energy news brief

Indonesia tero group was targeting Obama on November
http://jp.reuters.com/article/worldNews/idJPJAPAN-11125220090821
Toshiba bagged China bulb terbine of 20.6MW 6sets in Jiang Shi
http://www.recordchina.co.jp/group.php?groupid=34606&type=2
Russian hydropower station accident provable by tero group
http://mainichi.jp/select/world/news/20090822ddm007030123000c.html
Honda eyeing EV car implement in US in 2010
http://sankei.jp.msn.com/economy/business/090822/biz0908221045005-n1.htm


●PT PLN Plans Second 10,000MW Power Program In Indonesia

PT PLN, a state electricity company, plans to construct and manage 40% of second 10,000MW power program, generating loans from foreign banks, reported The Jakarta Post, quoting an official of PT PLN. Fahmi Mochtar, President Director of PLN, said: “We are ready to construct 40% of the power plants while the rest will be by independent power producers [IPPs]. We will ask [for] loans from various foreign banks [to finance the projects].”

Cisokan Valley



(注)A (1) 090822A Indonesia, energy-business-review,(2) title: PT PLN Plans Second 10,000MW Power Program In Indonesia,(3) http://www.energy-business-review.com/news/pt_pln_plans_second_10000mw_power_program_in_indonesia_090820,(4) Published:20-August-2009,
By Staff Reporter,(5) PT PLN,(6) second 10,000MW power program,(7) Fahmi Mochtar, President Director of PLN,(8) independent power producers (IPPs),(9) World Bank,(10) Japan Bank for International Coorporation (JBIC),(11) German financing institution KfW,(12) Asian Development Bank (ADB),(13) Saudi Arabia,(14) Java-Bali system,(15) 1,200MW add-on gas and coal-fired power plant (PLTGU) Muara Tawar in Bekasi, West Java,(16) 1,000MW hydro power plant at Upper Cisokan in West Java,(17)

今日の参考資料

●090822A Indonesia, energy-business-review
インドネシアのPLNは第2次10,000MW開発プログラムを発進
PT PLN Plans Second 10,000MW Power Program In Indonesia
http://my.reset.jp/adachihayao/index090822A.htm

http://www.energy-business-review.com/news/pt_pln_plans_second_10000mw_power_program_in_indonesia_090820

最近の関連資料

●090523A Indonesia, The Jakarta Post
インドネシアのプルタミナが地熱で第2次クラッシュ参入
Pertamina prepares second phase HoA for 10,000 megawatt program
http://my.reset.jp/adachihayao/index090523A.htm
●090523B Indonesia, english.cri.cn
インドネシアのジャワ島などの電力危機に緊急措置
Indonesia Sets Steps to Overcome Power Crisis
http://my.reset.jp/adachihayao/index090523B.htm
●090407A Indonesia, The Jakarta Post
インドネシアのPLNがIPPからの売電単価を設定へ
PLN to set power purchase prices for independent producers
http://my.reset.jp/adachihayao/index090407A.htm


●Starved for Power in Indonesia

An ambitious plan to electrify rural areas is probably in trouble at the onset President Susilo Bambang Yudhoyono will soon launch his second five-year government after the convincing July election victories of his Democratic Party and his Islamic allies. The recent Jakarta bombings might hold him back a little, but that 35 percent of Indonesians have no electricity could hold him back a lot more.



(注)B (1) 090822B Indonesia, asiasentinel,(2) title: Starved for Power in Indonesia,(3) http://asiasentinel.com/index.php?option=com_content&task=view&id=2017&Itemid=226,(4) Tag it:Written by Terry Lacey,Friday, 21 August ,(5) President Susilo Bambang Yudhoyono,(6) PLN,(7) Fahmi Mochtar, President Director of PLN,(8) second 10,000MW power program,(9) Independent Power Producers (IPPs),(10) Renewable Energy,(11) Badan Koordinasi Penanaman Modal,(12) Jacob Purwono, director general for electricity and energy utilization in the ministry of mines and energy,(13) map source: rovicky.wordpress.com/.../,(14)


今日の参考資料

●090822B Indonesia, asiasentinel
インドネシアでは人口の3分の一が電気がなく大統領に期待
Starved for Power in Indonesia
http://my.reset.jp/adachihayao/index090822B.htm

http://asiasentinel.com/index.php?option=com_content&task=view&id=2017&Itemid=226

最近の関連資料

●090523A Indonesia, The Jakarta Post
インドネシアのプルタミナが地熱で第2次クラッシュ参入
Pertamina prepares second phase HoA for 10,000 megawatt program
http://my.reset.jp/adachihayao/index090523A.htm
●090523B Indonesia, english.cri.cn
インドネシアのジャワ島などの電力危機に緊急措置
Indonesia Sets Steps to Overcome Power Crisis
http://my.reset.jp/adachihayao/index090523B.htm
●090407A Indonesia, The Jakarta Post
インドネシアのPLNがIPPからの売電単価を設定へ
PLN to set power purchase prices for independent producers
http://my.reset.jp/adachihayao/index090407A.htm





























元へ戻る



Past News

●Thailand natural gas supply in trouble (090821)
●Philippines Kepco proposing smart grid with renewable energy (090820)
●LNG world market big wave with China move (090819)
●Politics of dam construction along the Salween (090818)
●Nepal prime minister to Delih for Pancheswar (090816)
●Chinese demand for foreign coal soars (090815)
●Laos Luwangprabang Nam Khan Chinese dams agreed (090814)
●Indonesian nationalism for resources and Donggi LNG (090813)
●Indian environment minister Ramesh fighting for climate change (090812)
●Srilanka comleting China's 300MW coal-fired by 2010 (090811)
●Pakistan promote 7,100MW Bunji hydropower (090809)
●Mekong River Comission to investigate 11 dams on main (090808)
●Vietnam nuclear power plan progressing to decision (090807)
●China NGO appealing to Beijin for possible dam disaster (090807)
●Myanmar ASEAN meeting Thaland took leadeship in gas and hydro (090805)
●Vietnam thermal power development and Japan firms (090803)
●Frail power sector holds Pakistani economy hostage (090802)
●India LNG investment in Cochin port Kelara (090801)

●Nepal requeting China to support hydropower project (090731)
●Mekong countries receiving US re-approach (090730)
●Thai Energy Minister for Mandalay to meet ASEAN (090729)
●Philippines natural gas to be expanded western ward (090728)
●Srilanka targetted by China, India, and Japan (090726)
●Myanmar gas pipe line to be shared by Indian firms (090724)
●India NELP VIII expolaration bidding soon (090723)
●China dam construction trouble in Yunnan (090722)
●Cambodia Kamchay and Sihanouk coal-fired progressing (090721)
●Nepal President Yadav leadership for hydro development (090720)
●Philippines indegenous energy needs big fund (090718)
●China discuss climate change with Chu US Energy Secretary (090717)
●Indian nuclear power receiving Ms Clinton visiting (090715)
●Indonesia crash program and LNG plnt (090714)
●Pakistan power shortage attacks industries (090713)
●Vietnam suffred power shortage in Summer (090712)
●India coal-fired thermal UMPP progressing (090708)

●Myanmar Arakan hydropower development Kaladan river (090707)
●Bhutan hydropower to be 10000MW by 2020 (090705)
●India Sikkim 510MW Teesta V hydro to be dedicated (090703)
●Mekong mainstream dam development opposed (090702)
●Srilanka coal-fired plant progressing with China aid (090701)

●Philippines Luzon grid stable untill 2015 (090630)
●Malaysia advanced in nuclear technology (090628)
●Thailand postponing gas production in Myanmar (090626)
●India nuclear boss emphasizing thorium resources (090625)
●Myanmar hydropower to provide to Bangladesh (090624)
●Indonesia oil and gas nationalism by the government (090623)
●Philippines Visayas renewable and coal power discussed (090622)
●Vietnam gas getting Vhvron investment 4 billion dollars (090621)
●Vietnam 1,100MW in operational by 2009 end (090619)
●Pakistan water resources to be assisted by China (090618)
●Vietnam claiming upsteram dams for delta (090617)
●India Arunachal environmental problem for hydropower (090616)
●LNG boosting in southeast Asia (090614)
●China environmental stop the Jinshajiang development (090612)
●China Begins Transition To A Clean-Energy Economy (090611)
●Bangladesh energy to be from gas and Bhutan (090610)
●Cambodia Sesan river to be developed by Vietnam (090609)
●Pakistan threats India for water with nuclear war (090608)
●Nepal Maoist chaos in with Indian hydro (090607)
●Vietnam institutional confusion to be solved in power sector (090606)
●Myanmar north and east states with China (090605)
●Mekong Secretariat will study on mainstream dams (090601)

●Indian new cabinet pushing rural electrification (090531)
●Mekong Power Summit dicussing main stream dam (090529)
●Indonesian oil production decline with irritation (090528)
●China coal production to be over capacity (090527)
●Philippines renewable energy boosting by IRR (090526)
●India nuclear development progressing with GEHitachi (090525)
●China curbing its energy policy to nuclear and green (090524)
●Indonesia second crash program geothermal (090523)
●Thailand PTT expanding its petroleum production (090522)
●Philippines struggling in high power rates (090521)
●China Yellow river Laxia hydropower operationasl (090520)
●Relation between India and Pakistan crucial (090518)
●Laos hydropower projects again moving (090517)
●Philippines coal-fired bidding out to IPPA (090516)

●India RIL's gas project goes on steam (090402)

●Smart Grid will only be as good as security behind it (090328)
●Bhutan developping 10,000MW with India (090327)
●Bhutan developping 10,000MW with India (090326)
●India and Pakistan disputing Kishanganga (090325)
●India and USA cooperation in Nuclear and solar (090324)

●Myanmar proceeding dams of 35 sites (080323)
●India more hydropower against China plan (080322)
●Clean cars charge up on dirty electricity (090321)
●India enjoying cheap LNG price saving money (090320)
●Indonesia's LNG going to Europe no to Japan (090319)
●Obama' regime will not turn backs on coal (090315)
●China developping two hydro and two wind power (090313)
●Nepal and Germany for Marsyangdi Hydro development (090312)
●Obama's smart grid moves Google and Oracle (090311)
●Cambodia small hydropower development (090310)
●India's coal-fired thermal progress in financial (090309)
●Srilanka power sector turning for hydro and coal (090308)
●Vietnam National Assembly working for resettlement villagers (090306)
●South Asia energy development cooperation (090305)
●Vietnam Power development for gas in O Mon (090304)
●6000MW hydro project moving at boudary between India and Nepal (090303)

●Philippines Energy plan to review due economic slump (090227)
●NHA applauds Secretary Chu's comments on pumped storage (090226)
●Indonesia's aircrft problem causes Power delay (090225)
●Pakistan Zardari visits Three Gorges dam in China (090224)
●Chinese utility tries to join electricity pioneers (090223)
●Pakistan Neelum-Jherum hydro started (090222)
●Indonesia possibly fail second fast track (090221)
●Why Vietnam Power Project delaying (090220)
●Nepal India Follow-up push to bilateral commitments (090219)
●Nepal Upper-Tamakoshoi hydro exoand to 456MW (090218)
●Indonesia Japan new deal of LNG (090217)
●ADB to provide US$ 106 million for Bhutan (090815)
●Vietnam Son la dam happens crac (090214)

●Indonesia get China loan more strict (090213)
●Cambodia dam start construction (090212)
● Indon eian Energy Changes (090211)

Accelerating India’s nuclear development (081003)
Tibetan Plateau water source for continent (081002)
India's power distribution reform (081001)
● Renewable Energy Bill in Philippines (080929)
● Indonesia's bio-fuel (080928)
Salween river dam development (080927)
China and the Mekong Basin Conference (080926)
India, 60,000MW hydropower by 2025 (080925)
China and India in a scramble for Nepal (080924)
The root cause of Vietnam's power shortage (080923)
●India's Initiative for South Asia power grid (080922)
Pakistan's private thermal power development (080921)
India,600,000 MW nuclear power development (080920)
Nepal's hydropower development challenge outback (080919)
Cambodia's hydropower development study (080918)
●India's power transmission corporation division (080915)
Kosi River in India and Nepal's problems (080914)
Thailand natural gas power obsessed(080913)
●India's coal red light (080912)
India, Tata, 10,000 MW development (080911)
Indonesia's crude oil production decline (080910)
India's power reform and pool market (080909)
Vietnam's power crisis continues (080908)
Indonesia's second Crash Program (080907)
China and India race to capture the uranium (080906)
India's gas to Warring Period (080905)
India's hydropower development delay (080904)
●Myanmar's hydro and natural gas (080903)
●Power crisis in Indonesia (080902)
●India and Nepal river management (080901)
●India's natural gas production (080831)
●China and Vietnam in Laos (080830)

Any comment, please
PGA02435@nifty.com

Back


Asian Energy Map


大きな地図で見る

Back


Whole web

カスタム検索

This web site

カスタム検索

元へ戻る



[プレスブログ]価値あるブログに掲載料をお支払いします。


海外出張直前重要サイト
通貨換算||時差||電話コード||フライト一覧||ホテル予約||各地気象||世界天気予報|| 海外安全情報|| 海外用品|海外医療||海外出張支援|| 海外赴任ナビ|| 成田へ|| 羽田へ|| 関空へ|| 伊丹へ|| ロンリプラネット|

| 鈴木篁氏] | Livedoor | |@nifty| | Gmail | |Bangkok Post| |Manila Bulletin| |Jakarta Post| |Economic Times| |時事通信| |ZAKZAK|

○https://www.blogger.com/start?hl=ja ○http://www.google.com/intl/en/press/intl-zeitgeist.html ○http://translate.google.com/translate_t?hl=ja# ○http://maps.google.com/maps?hl=ja&tab=wl 城km z http://news.google.com/news?hl=ja&sa=N&tab=ln&q= ○https://www.google.com/adsense/login3 ○http://mail.google.com/mail/#inboxhttp://www.google.com/ig?hl=jahttps://www.google.com/webmasters/tools/docs/ja/about.htmlhttps://www.google.com/webmasters/tools/summary?siteUrl=http%3A%2F%2Fmy.reset.jp%2F%7Eadachihayao%2F&hl=ja


Site Map
| Who am I| | Asian Power & Energy Front| | Photos | | Japanese Version |

お問い合わせまたはご意見は下記メールアドレスへ
PGA02435@nifty.com


-->


[プレスブログ]価値あるブログに掲載料をお支払いします。